Description:
– Dynamic analysis of the eight-point temporary mooring system for the Yambo II floating desalination plant using Bentley MOSES.
– Hydrodynamic modelling of the barge using three-dimensional diffraction analysis.
– Evaluation of mooring line pretensions, dynamic tensions and barge excursions under combined wind, wave and current loading.
– Assessment of intact and critical single-line failure conditions against API RP 2SK criteria.
– Evaluation of anchor holding capacity and uplift using as-built anchor coordinates and local water depths.
– Time-domain checks of minimum barge clearance from the jetty and dolphin structures, including governing damaged-line cases.





