56MW NTPC KAWAS FLOATING SOLAR PROJECT

Client – Greatwater Maritime LLC (UAE)

Description:
– The project involves the mooring analysis of 8 FSPV blocks placed inside the reservoir located at the NTPC KAWAS power plant.
– The mooring system is designed to cope with the varying water level of the reservoir.
– Evaluation of maximum mooring line tensions due to environmental loads.
– Evaluation of solar block excursions due to environmental loads.
– Evaluation of maximum uplift and drag on the mooring anchors.
– Evaluation of one-line damage case mooring analysis.